Managing supply chain stress continues

Subscription Required

Now open to all readers.

By Scott Hamilton

Jan. 9, 2024, © Leeham News: The COVID-19 pandemic impact on aerospace and its supply chain was deep and long lasting. The airframe and engine manufacturers haven’t fully recovered. Part of the reason is that the supply chain hasn’t fully recovered, either.

LNA attended the Aviation Forum in Hamburg, Germany, last month. On the sidelines of the event, we met with Jurgen Westermeier, the chief procurement officer for Airbus. We discussed the supply chain and other issues. The following is a transcript of this interview. It has been edited for space and clarity.


Related Story:


Read more

737 incidents prompt new scrutiny at Boeing

 By the Leeham News Team

 Analysis

 Jan. 8, 2024, © Leeham News: Following in the footsteps of the 737 rudder bolt omission inspection just last month, we have the Jan. 5 incident on Alaska Airlines Flight 1282 in which an emergency exit plug door blew off the airplane at 16,500 ft.  This may indicate another quality assurance failure at either Boeing or Spirit AeroSystems.

The door plug design used on the Boeing 737-900/900ER, 737-8-200 and 737-9. Credit: Boeing, via the National Transportation Safety Board.

We don’t know if this is a Boeing problem, a Spirit problem, a bolt manufacturer problem, or an Alaska Airlines problem. It’s way too soon in the investigation to draw conclusions. Certainly, because it’s Boeing’s name on the airplane, and especially given the MAX history, people are jumping to the conclusion that Boeing screwed up again. While this may ultimately prove true, LNA is not at all prepared to conclude today that this is the case.

Illustration of the bolt locations securing the Boeing 737-9 door plug to the airframe. Credit: Capt. Chris Brady.

The flight left Portland (OR) for Ontario (CA) about 4:30pm. Six minutes later, as the two-month-old Boeing 737 MAX 9 was climbing through 16,500 ft to cruising altitude, the inactive emergency exit plug door, aft of the wing on the left side of the plane, separated from the aircraft. Decompression followed, with an emergency descent and landing back at Portland. There were no serious injuries.

The area where the door plug and cell phones fell from Alaska Airlines Flight 1282. Credit: Google Earth, NTSB.

Boeing and Spirit have been plagued in recent years by quality “escapes.” Inspection and quality assurance may be the culprit again. The official investigation will take some time. The rapid issuance of the Emergency AD Note mandating only a one time inspection is a logical response to something having been misassembled, with the fix being to verify it is assembled per drawing. Whether this is another piece of poor workmanship not being caught by inspection remains to be seen.

The following analysis was compiled by LNA’s news team.

Read more

Outlook 2024: Embraer’s continued recovery

Subscription required

By Bjorn Fehrm

January 8, 2024, © Leeham News: Embraer was hit by a double whammy before and during COVID. The non-closure of the merger of Boeing’s and Embraer’s Commercial Aircraft Divisions and the halving of its E-Jet deliveries during COVID. The year that passed marked the recovery from the extra cost and effort of the non-merger and an increase in E-Jet deliveries and orders.

It was also a progress year for the EVE eVTOL venture, with Embraer finalizing design and starting prototype production. Despite the EVE lagging behind other programs by about a year, the customers believe it’s one the most viable programs. Eve doubles the preorders of the nearest competitors.

The past year will also be seen as the break-trough year for the KC-390, Embraer’s bet to replace the venerable Lockheed-Martin C-130 military airlifter. The customer list went from three to five, with more country air forces in serious negotiations for the KC-390.

Summary:
  • The E-Jets are trending back to normal volumes with better margins.
  • EVE is the best-selling eVTOL, as operators trust Embraer’s knowledge and support.
  • The KC-390 is on its way to capture a big slice of the C-130 Hercules replacement marker.

Read more

Bjorn’ s Corner: New aircraft technologies. Part 44. Operation and Continued Airworthiness

By Bjorn Fehrm

January 5, 2024, ©. Leeham News: We are discussing the different phases of a new airliner program. After covering the Design and Production, we now look at the Operational phase of a new airliner family.

For the customer, the design and production are exciting and interesting, but it’s the information and services around the operational phase (Fleet Support in Figure 1) of the airliner that are most important to the airline customer.

Figure 1. The development plan for a new airliner. Source: Leeham Co.

Read more

Outlook 2024: Boeing needs a boring year in 2024

By Dan Catchpole

Subscription Required

Jan. 4, 2024 © Leeham News: Boeing’s priorities in 2024 are clear: get the job done on time and without drama, and don’t cause any scandals. In short, it needs a boring year. However, to do that, the aerospace giant has to overcome several obstacles.

Boeing Commercial Airplanes has to increase production rate goals, sign a new labor contract and help suppliers along. That means going against Boeing management’s cultural predilection for extracting concessions from unions and contractors.

Defense is a mess, and there’s little reason to think it will improve much this year. Several fixed-cost programs are bleeding money. Boeing is competing for three major United States Department of Defense programs, but it is not favored to win any of them. This year, leadership is expected to focus on controlling costs.

A new position of executive vice president and chief operating officer for The Boeing Co. was created last month. Stephanie Pope, previously CEO of Boeing Global Services, was named to fill this slot. She’s an unknown to some customers and hasn’t run a company approaching the size of Boeing. She’ll have to prove herself in this new position of greater responsibilities than she’s ever had.


Related Articles

Summary
  • BCA has to smoothly increase production rates.
  • Sign a new contract with Machinists.
  • Staunch the bleeding at Boeing Defense, Space and Security.

Read more

Outlook 2024: European airline consolidation

Subscription Required

By Gordon Smith

January 3, 2024, © Leeham News: Consolidation is certainly in the air. Even before the shock announcement on December 3 that Hawaiian and Alaska are planning to tie the knot, the industry was gripped by the ‘will-they, won’t they’ saga of the proposed JetBlue and Spirit deal.

Although it’s US carriers that have been making headlines, the European airline market is experiencing its own flurry of mergers and acquisitions. This is a topic LNA covered at length pre-pandemic (Our backgrounder is available here).

At the time of this writing, big changes are happening at three of the continent’s best-known flag carriers. Significant shareholdings in ITA Airways (formerly Alitalia), TAP Air Portugal, and SAS Scandinavian Airlines are changing hands, with Europe’s aviation supergroups spying an opportunity to expand their respective empires.

Tapping into the latest data provided to LNA from aviation data analysts Cirium, we can get a better understanding of what these changes could mean for existing fleets and upcoming airliner deliveries.

Read more

JAL A350 ground collision is first hull loss by damage and fire of an all-composite airplane

Jan. 2, 2024, (c) Leeham News: Editor’s Note: With the ground collision (Jan. 2, 2024, Tokyo time) of a Japan Air Lines Airbus A350 and its destruction by fire, we’re reposting this article from March 2009. It was then that Boeing was in early production of the 787 and the Federal Aviation Administration was studying what Special Conditions to require in the event of a fire on a composite passenger airliner. The 787 was the first all-composite airliner and how composite of this scale would react in a fire was then mostly known. The only all-composite, large airplane fire had been that of the B-2 Stealth bomber.

Video via Times of London.

LNA spoke with airport fire officials about preparing for a composite airliner fire and we discussed the challenges the US Air Force had in putting out the B-2 fire. Fires occurred on two 787s after entry into service: a JAL aircraft that was parked at the Boston airport after a flight from Tokyo and an Ethiopian 787 parked in London. The JAL fire was traced to a battery. Airport firefighters faced challenges in putting out the fire. The airplane was heavily damaged but repaired. The Ethiopian 787 fire was traced to pinched wires creating a short at the emergency transmitter locator in the top of the fuselage. The plane was heavily damaged but repaired. The JAL A350 is the first hull loss of a composite airliner and the first by fire.

Investigators will learn all kinds of lessons from the A350 accident.

All passengers and crew on the A350 escaped. The five crew on the Japanese Coast Guard airplane involved in the collision died.

The March article is below.

Read more

Outlook 2024: Expectations growing at Airbus

Subscription Required

By Gordon Smith

January 2, 2024, © Leeham News: Many businesses start to wind down operations as the holiday season approaches – but for the big OEMs, the year-end usually means a sprint finish. Airbus is no exception.

Speaking to investors in early November, CEO Guillaume Faury reconfirmed the company’s earnings target for 2023 and sounded optimistic about the prospect of meeting its delivery goal of “around 720” aircraft for the calendar year: “We think we are well-placed to deliver around 161 planes to fulfill the guidance. For those deliveries, we obviously have a high degree of visibility on parts, including engines,” he said.

Although the official tally for 2023 is not likely to be published until next week, the latest figures from November offer valuable insight into progress towards the goal. In a December 5 update, the OEM revealed that it delivered 64 aircraft during the previous month, bringing the year-to-date total to 623 examples. This left 97 units to be handed over before the start of 2024.

Read more

Done for 2023, LNA returns on Jan. 2 with our Outlook series

The Kingston, WA, ferry terminal parking lot. Decorations by the City of Kingston, WA. Photo by Scott Hamilton.

Dec. 22, 2023, © Leeham News: Today is LNA’s final posting for 2023, absent some breaking news of international importance. We resume posting on Jan. 2, 2024.

We will begin the New Year with a series of Outlook articles, looking ahead for 2024. This was a regular feature until the COVID pandemic pretty well destroyed any outlooks for the two years of lockdown. This year (2023) began on the tail end of the pandemic recovery. Now, with the global economy largely back to normal, we resume our Outlook series.

We’ll take a look at the airframe and engine OEMs and the ecoaviation sector.

In the meantime, Merry Christmas and Happy New Year wherever in the world you are.

The staff of Leeham News and Analysis.

Bjorn’ s Corner: New aircraft technologies. Part 43. Delivery

By Bjorn Fehrm

December 22, 2023, ©. Leeham News: We are discussing the different phases of a new airliner program. After covering the Design, Prototype phase, and Production, we now look at the first deliveries.

After about seven to nine years of development and production preparation, it’s finally time for the first delivery of the new aircraft.

Figure 1. The development plan for a new airliner. Source: Leeham Co.

Read more