Guy Norris, one of the best aerospace reporters in the world, reports in the current issue of Aviation Week that Boeing has given up on its current round of efforts to design a successor to the 737.
According to Norris and co-author Robert Wall, Boeing is going back to the drawing board because technology is not there yet for a replacement.
The full story may be found here. It’s a great read.
It generated a lot of headlines at the time of the USAF aerial tanker contract award to Northrop Grumman when it was revealed that a campaign adviser to Republican presidential candidate US Sen. John McCain one time had EADS as a client.
EADS, of course, is partnered with Northrop to offer the KC-30 tanker to the USAF. EADS is parent of Boeing’s arch-enemy, Airbus, and the KC-30 is based on the commercial A330-200 which essentially put Boeing’s 767 commercial airliner out of business. Boeing’s KC-767 is based on the commercial 767-200, with parts from the 767-300 and 767-400.
After Boeing lost the tanker award, critics of the decision blamed McCain for the loss, a position we find preposterous, but that’s neither here nor there. When it was discovered that a top McCain adviser was once a lobbyist for EADS, the conspiracy theorists really went to town.
We thought that the entire round of accusations was poppycock, and still do. (Disclosure: although we’re defending McCain on this one, we have no connection to his campaign and aren’t even for him; we liked Ron Paul in the primary and Barack Obama in the general.)
But with the McCain campaign adopting its own rules on ethics, conflicts of interest and lobbyists, the former EADS lobbyist quit the campaign.
A wire service story on the action may be found here.
Make it four. That’s the number of defense contracts Boeing has lost this year. This AP story outlines them.
Maybe it’s just coincidence, but Boeing certainly hasn’t done very well since protesting the first loss, that of the KC-45A tanker program. Maybe there’s no retaliation going on with the Pentagon. Maybe we’re just being cynical. But we can’t help wondering if there’s a connection.
The Financial Times reported today (May 15) that the UK government will help fund the research and development for the composite wing for the Airbus A350.
An excerpt:
Aerospace groups are joining forces with the government and regional development agencies to fund research and development aimed at strengthening the UK’s leading position in the manufacture of wings for commercial jets.
They are planning to invest £103m ($200m) in a three-year programme to develop and manufacture wings out of carbon-fibre composites, rather than aluminium. The R&D programme will be led by Airbus, the European aircraft maker, which has its wing design and manufacturing operations in the UK at sites near Bristol and in north Wales.
The full story may be found here, but it’s Subscription Required.
Our immediate thought, of course, was about that old bugaboo, government “subsidies” and the entire WTO/EU/USTR/Boeing/Airbus/USAF tanker series of fights.
This will only add fuel to the fire of the complainers over Airbus “subsidies.”
The Airbus response, of course, will be that Boeing gets plenty of R&D and “subsidy” support from NASA and the US Department of Defense.
Richard Aboulafia, Addison Schonland and Scott Hamilton discuss the winners (or not) between Airbus ands Boeing in the potential tie-up between United Airlines and US Airways and Delta and Northwest in this 15 minute podcast by AirInsight. (Subscription only.) The link is here.
EADS, parent of Airbus, reported a stronger-than-expected profit on higher production at its principal subsidiary. The details may be found in this AP story.
A couple of take-aways:
Airbus plans to take the A330/340 production to 12 a month by 2010 in response to demand for this airplane, higher and sooner than expected. This will further aid the cash flow shortfalls from the A380 program.
Northrop Grumman announced the grounding breaking for its KC-45A tanker even though the Government Accountability Office hasn’t rendered its decision on the Boeing protest of the tanker contract award by the USAF to Northrop.
This strikes us as incredibly premature and reminds us of another premature declaration:
Groundbreaking for the KC-45 Tanker Manufacturing Facilities
Set for June 28
Mobile, Alabama Site to Provide KC-45 Tankers to United States Air Force
WASHINGTON – May 13, 2008 – Northrop Grumman Corporation (NYSE: NOC) and its key subcontractor, EADS North America, will join local, state and federal officials and the citizens of Mobile, Ala., in a groundbreaking ceremony on Saturday, June 28. Ground will be broken at Mobile’s Brookley Field, where two adjacent manufacturing facilities will be built to produce the nation’s new fleet of aerial refueling tanker aircraft.
The ceremony has been scheduled pending the outcome of the Government Accountability Office review of the tanker contract award. “We anticipate a favorable decision and look forward to starting construction on this historic facility,” said Ronald D. Sugar, Northrop Grumman chairman and chief executive officer. “We’re committed to transforming Mobile into the centerpiece of an expanding aerospace corridor.”
“This event underscores the fact that we are ready to get to work now,” Sugar said. “We need to move forward quickly to provide our men and women in uniform what the Air Force has identified as its number-one acquisition priority – the new refueling tankers they so desperately need.”
Northrop Grumman and EADS North America are committed to the U.S. Air Force and also have contractual agreements in place with one another, the state of Alabama and the city of Mobile to ensure construction of the facilities is ready to move forward.
“We are excited that Brookley Field will once again be a hub of American military aircraft manufacturing,” said Rep. Jo Bonner of Alabama’s 1st Congressional District. “There is no doubt that Mobile is poised to be the crown jewel of a rapidly growing aerospace center of excellence in the Southeastern United States, bringing thousands of jobs and creating endless opportunities for our entire region.”
EADS North America will deliver the KC-45 aircraft platform to Northrop Grumman. Airbus, an EADS company, is responsible for manufacturing at its Mobile final assembly facility and will assemble, test and certify the aircraft before delivery. Following delivery to Northrop Grumman, the aircraft will receive the necessary military modifications to turn the commercial airframe into a U.S. Air Force KC-45 Tanker. In keeping with U.S. Department of Defense requirements, only Northrop Grumman and U.S. government employees with appropriate security clearances will militarize the tanker aircraft.
“EADS North America is fully committed to providing Northrop Grumman with an aircraft built in the U.S.,” said Ralph D. Crosby, Jr., EADS North America chairman and chief executive officer. “More importantly, our men and women in uniform require and deserve the most capable system available. They have been waiting far too long for a modern tanker. Our entire team is ready to get to work now.”
Northrop Grumman’s architectural and engineering firm for the facility, BRPH Companies Inc., was selected last year and is prepared for the construction phase. Northrop Grumman’s facility is scheduled for completion and initial operation late next year. BRPH is leading a team consisting of KBR’s Mobile office and Thompson Engineering, headquartered in Mobile.
The groundbreaking ceremony occurs just a few days after the 60th anniversary of the start of the Berlin Airlift. This is significant because Brookley Field was the base from which C-54 transport aircraft supported the airlift.
About the KC-45
The KC-45 Tanker aircraft will be assembled in Mobile, Ala., and the KC-45 team will employ 48,000 American workers at 230 U.S. companies in 49 states. It will be built by a world-class industrial team led by Northrop Grumman, and includes EADS North America, General Electric Aviation and Sargent Fletcher.
Northrop Grumman Corporation is a global defense and technology company whose 120,000 employees provide innovative systems, products, and solutions in information and services, electronics, aerospace and shipbuilding to government and commercial customers worldwide.
###
0508-292
US Sens. Patty Murray (D-Boeing) and Maria Cantwell (D-WA) have asked the White House to investigate the claim by Northrop Grumman that 48,000 direct and indirect jobs will be created with the KC-30 program.
The KC-30 will be assembled in Mobile (AL) for the USAF’s KC-45A program.
Murray, who is actually D-Washington, is Boeing’s most vocal and hyperbolic advocate (along with US Rep. Norm Dicks, also D-Boeing/Washington), and has vowed to block the Air Force award to Northrop because the KC-30 is based on the Airbus A330-200, and Murray has been leading a crusade against Airbus for years.
Murray, Cantwell and a couple of other members of Congress want the White House to determine how Northrop’s job count increased from 25,000 to 48,000 after the award was announced and after the jobs issue erupted as a major point of controversy, according to this report in The Seattle Post-Intelligencer.
It’s a fair question and one we raised at the time in this report on our Corporate website. We were surprised and skeptical of the doubling of jobs claim as well. Our report details how Northrop got its new number.
Whether one accepts Northrop’s methodology or not is a matter of debate, but at least Northrop offers up one. Boeing does not for its job claims of 44,000 direct and indirect jobs for the KC-767 program, despite having been asked several times by reporters and analysts (including us). Furthermore, there is ample reason to suspect the Boeing figure.
In 2001, Boeing claimed 22,000 jobs were tied to the 767 program when the company was producing these at a rate of 36 a year–two to three times the rate proposed by the Air Force for the KC-45A program. Boeing also claims just 25,000 jobs associated with the C-17, which is has more US content than the 767 (the 767 fuselage, tail and certain wing components are built in Japan, Italy, the UK and Canada while these are built in the US on the C-17). The production rate for the C-17 is similar to that proposed for the KC-45A.
So how can Boeing claim there are twice the jobs at as little as one third the rate for the KC-767 vs. the commercial 767 at its peak? How can there be nearly twice the jobs associated with the KC-767 vs. the C-17? Boeing has never answered either of these questions.
As long as Boeing boosters want an investigation about Northrop’s jobs claim, this should be expanded to include Boeing’s job claims.
Having said all that, on the merits of the award, the entire jobs issue is irrelevant anyway. Jobs were not part of the RFP or evaluation process. This issue has been political from the get-go, and should have no bearing on the award at all; the award should be entirely about technical merits.
Leasing giant International Lease Finance Corp. revealed today in a federal filing that its entire order of Boeing 787s will be delayed “an average in excess of 27 months per aircraft and span across ILFC’s entire order.” The company’s parent AIG Group revealed this news in its March 31 first quarter Securities and Exchange filing, accompanying the announcement of a huge loss for the quarter made after the stock market closed Thursday, May 8.
The first of ILFC’s 787s were originally scheduled to be delivered in 2010 through 2017. The delay, which is in line with other customers that have so far publicly revealed the impact, means that the first ILFC 787 will be delivered in 2012 or 2013 (depending on what month the original delivery schedule began).
More, 3:00PM PDT: James Wallace of The Seattle Post-Intelligencer just published this item about Air Canada’s 787 order being 30 months late.
New, Monday, May 12, 1000 AM PDT: ILFC’s own 10Q filing (made Friday) with the SEC is more detailed about its 787 delays. ILFC says the airplanes will be delivered 19-30 months late, with the average delay in excess of the 27 months reported in the AIG 10Q.
Airbus and Boeing have updated their orders for April (Boeing through April 29, Airbus for the entire month) and Airbus maintains a slight lead over Boeing for net orders, 397 to 346, year-to-date.
But the Airbus tally doesn’t reflect what’s happened to the 65 orders for Skybus Airlines of the US, which has ceased operations following bankruptcy. If these show up as canceled in the May tally, Boeing will almost certainly for ahead for the month.
Boeing has 236 net 737 orders for the year; Airbus has 300 net A320 family orders.
Boeing has two 747 orders vs. three A380s.
Boeing has no 767 orders vs. Airbus’s 57 A330 orders (11 of which are freighters).
Boeing has 30 777 orders vs 32 A350-900s and 0 A350-1000s.
Boeing has 79 787 orders vs 15 A350-800s.
It’s been pointed out to us that the A330 competes with the 787 as much as it does with the 767, because the 787 is designed to replace the 767 and the A330 seating capacity is similar to the 787. If one accepts this thesis, and there’s certainly merit to it, then the category stacks up this way:
767-767F/787 orders, 79, vs A330P (46), A330F (11) and A350-800 (15), or Airbus total 72.
Boeing single-aisle airplanes: 235, twin-aisle: 111.
Airbus single-aisle: 300, twin-aisle and wide-body cargo: 107 (minus 10 A318s).
Boeing’s YTD orders have a mix of 32% twin-aisles and 68% single-aisles.
Airbus’s product mix is 26% wide-bodies and 78% narrow bodies.