Subscription Required
Sept. 27, 2018, © Leeham News: Boeing hasn’t gone to a production rate of 57/mo for its 737 and studies have long been underway looking at a rate of not only 63/mo but also 70/mo, supply chain sources tell LNC.
Rate 57, up from 52, is scheduled for next July. Sixty-three has long been considered the maximum allowed for the current Renton (WA) factory, the sole location where commercial 737s are assembled.
But Boeing, in yet another step in its drive for more efficiencies, is analyzing how to push 70 airplanes a month through the same facility.
To read the rest of the article Login or Subscribe today.
Category: Airbus, Boeing, Middle of the Market, MOM, New Midmarket Aircraft, NMA, Premium
Tags: 737 MAX, 737-8, 737-9. 737-10, A321NEO, A321Plus, A321XLR, Airbus, Boeing