November 10, 2023, ©. Leeham News: We are discussing the different design phases of an airliner development program. After covering Conceptual, Preliminary, and Detailed design, we now discuss prototype manufacturing and testing.
Today, we look at the different flight test aircraft needed and their roles.
Subscription Required
By Gordon Smith
Nov 9, 2023, (c) Leeham News: Airbus struck a defiant tone on Wednesday as the company posted strong numbers for the first nine months of 2023. Despite supply chain headwinds, the European firm’s Q323 adjusted Earnings Before Interest and Taxes (EBIT) rose by 21% year-on-year to €1.013bn. The figure was influenced by increased commercial aircraft deliveries and the positive impact of currency hedging.
The robust performance of its civil portfolio was dampened by a net loss at Airbus’ Defence & Space division. The group took a hit of €400m relating to “updated estimates at the completion of certain satellite development programs” which were mainly recorded in the third quarter.
For context, let’s compare these figures with those published at the same time last year. In its nine-month results for 2022, the OEM delivered 437 commercial aircraft, with revenues of €38.1bn generating an adjusted EBIT of €3.5bn. Free cash flow comprised €2.9bn.
Speaking during a follow-up investor call, Airbus CEO Guillaume Faury was bullish in his assessment. He said that the company is confirming its earnings target for 2023 and would be ramping up aircraft production in the years ahead: “We think we are well-placed to deliver around 161 planes to fulfill the guidance for the year. For those deliveries, we obviously have a high degree of visibility on parts, including engines.”
Faury’s positive outlook appeared slightly at odds with comments from other industry heavyweights in recent days. On Tuesday, Steven Udvar-Hazy from Air Lease Corporation suggested OEMs could miss their year-end goals as chronic engine supply issues persist.
Subscription Required
By Judson Rollins
November 7, 2023, © Leeham News: Maintenance costs and lead times have been a growing topic in aviation circles and financial markets since last month’s Aviation Week MRO Europe conference in Amsterdam.
Wage and commodity inflation have been widely identified as key cost drivers in many regions. However, this has been compounded by ongoing part shortages, deferred maintenance from aircraft flown less than normal in 2020-2022, and the retention of older aircraft to maintain capacity in the face of new-generation engine reliability issues and resulting groundings.
Even the Financial Times recently covered the impact of MRO constraints. Consultant Kevin Michaels of AeroDynamic Advisory told the FT that airline maintenance spending had ballooned from a historic 8%-10% of airline costs to an estimated 14% this year.
By Bjorn Fehrm
November 6, 2023, ©. Leeham News: Embraer presented its 3Q2023 results today. Commercial aircraft deliveries increased by 50% to 15 E-Jets compared with 10 jets in 3Q2022, and Executive jets delivered 28 jets versus 23 for 3Q2022.
Revenue for the group increased by 38% to $1,284m ($929m) for the quarter. The Services side increased revenue by 24% to $366m ($295m). The Defense revenue was up 40% to $133m($95m).
EBIT was $84m versus $11m for the same quarter last year. The company retained the 2023 guidance to deliver 65-70 E-jets and 120-130 Executive jets for the year.
By Dan Catchpole
Subscription Required
Nov. 6, 2023, © Leeham News: Spirit Aerosystems’ new CEO Pat Shanahan’s focus right now is “to restore confidence in the company” with its biggest customers—Airbus and Boeing.
During a Nov. 1st conference call discussing the company’s third quarter earnings, Shanahan said, “I recognize we have disappointed our stakeholders.”
Shanahan just came on as chief executive in October to help turn around Spirit, which has been flailing, along with much of the aerospace supply chain. Boeing and Airbus will be watching Shanahan’s progress. He gained a reputation as Mr. Fix-It during his time at Boeing.
November 3, 2023, ©. Leeham News: We are discussing the different design phases of an airliner development program. After covering Conceptual, Preliminary, and Detailed design, we now discuss prototype manufacturing and testing, Figure 1.
Today, we look at the role of the first flying prototype.
By Dan Catchpole
Subscription Required
Nov. 2, 2023 © Leeham News: High over Montana, Andy “Jeeves” Barry slipped the McDonnell Douglas DC-8 to the right and out of the Boeing 737-10’s wake to “get some fresh air.”
NASA’s uses a highly-modified McDonnell Douglas DC-8 as a test platform for its Armstrong Flight Research Center. (Photo by Dan Catchpole)
After a few minutes, the NASA research pilot edged the DC-8 behind the MAX, trailing about a mile and a half or so. It was another in a slew of test flights in October that he’d spent riding the 737’s bumper in NASA’s venerable DC-8 research aircraft.
The former U.S. Navy aviator eased the workhorse into a slot of calmer air in the 737’s wake, he said. “…[I]n that sweet spot of that secondary (wake) and just above the primary wake is where we lived the whole time and got the best science that they really loved the entire time we were out there.”
NASA and Boeing collaborated on the flights to test the effect of sustainable aviation fuels (SAF) on the formation of contrails, short for condensation trails, which climatologists contribute to global warming. The 737-10 alternated between burning jet fuel and 100% SAF, while the DC-8 sampled the air in its wake.
Subscription Required
By Gordon Smith
Oct 31, 2023, (c) Leeham News: Robust demand in the civil aftermarket sector has helped propel Safran Group’s Q3 2023 revenues upwards. The French firm shared its latest sales results on October 27 and confirmed that it was on track to achieve its year-end targets – but the positive performance hasn’t been universal.
A choppy combination of headwinds and tailwinds is currently buffeting the business, whose vast range of interests includes engine development, aftermarket, aircraft interiors, and other MRO-related sectors.
Overall, revenues were up 20.1% year-on-year at €5.82bn, tracking estimates of €5.79bn. As a result, the company reiterated its FY23 adjusted revenue guidance of €23bn, which was raised at the end of July.
Subscription Required
By Gordon Smith
Oct. 30, 2023, (c) Leeham News: MTU Aero Engines has confirmed its guidance for 2023 and posted higher adjusted sales and earnings in the third quarter. The numbers are the first reported by the German company since it revealed last month that it would take a €1bn knock from the Geared Turbofan (GTF) inspection program.
The exceptional charges dragged the engine manufacturer into the red with an EBIT loss of €410m for the first nine months of 2023. The comparative earnings figure for last year was €331m, representing a sharp 224% fall.
In September, the firm said well-documented powder metal issues with the Pratt & Whitney PW1100G-JM GTF would knock revenue and earnings for the year by around €1bn. During an earnings call on September 27 attended by Leeham News, MTU CFO Peter Kameritsch said he expected this figure to be slightly above the €1bn mark. Without adjustments, revenue was €3.7bn for the first nine months of 2023. Adjusted operating profit was €597m, up a third from the €448m posted a year earlier.
Commenting on the latest numbers, CEO Lars Wagner said: “MTU posted organic growth in all business segments. However, exceptional charges for the Geared Turbofan inspection program affected our figures.”
Adjusted net profit reached €138m, up from €113m a year earlier. Adjusted EBIT – which is the company’s chosen profitability metric – grew to €192m from €158m, representing a margin of 12.7%. Kameritsch acknowledged that “favorable exchange rate effects” provided a welcome boost to the numbers, alongside the company’s “positive revenue mix and a good cost base”.
October 27, 2023, ©. Leeham News: We are discussing the different design phases of an airliner development program. After covering Conceptual, Preliminary, and Detailed design (Figure 1), we now discuss prototype manufacturing and testing, where we today go deeper into structural testing.