Airbus’ A350-800 dilemma

Last week we discussed Airbus’ A350-1000 dilemma. The -1000 will be a fine airplane, but we concluded the company needs to go forward with a larger capacity “A350-1100” to match the size of the Boeing 777-9X, but take… Read More

Odds and Ends: Boeing to hike 737 rate; Passenger comfort, fees and PEDs

You read it here first: In June, we reported Boeing planned to take the 737 production rate to 47/mo by 2017 (and to 52 in 2019). Boeing announced on Halloween that it is taking the 737 rate to… Read More

Airbus’ A350-1000 dilemma

Airbus has a dilemma with what to do about the A350-1000. . Does the OEM stick with the -1000 as it is, ceding the 400 seat segment to Boeing with its new 777-9X? Or does it stretch the… Read More

Odds and Ends: Air France may cut A380 orders; Boeing Everett history; BBD, EMB miss targets

Air France May Drop A380s: Bloomberg reports that Air France may cut back its orders for the Airbus A380s. This continues the challenge of Very Large Aircraft sector sales. Boeing has cut production rates twice for its 747-8…. Read More

Odds and Ends: XYZ–Next USAF aerial tanker specs; Analysts on CSeries ahead of earnings

KC-XYZ: The USAF hasn’t even received the first Boeing KC-46A, which was the tanker award from the KC-X competition, and it has begun drawing up specifications for the follow-on competition, the KC-Y. The KC-Y is the second tranche… Read More

Boeing 777X engineering assigned outside Washington State

The Seattle Times, Reuters and others are reporting that Boeing has decided to assign 777X engineering outside the State of Washington. The news went down like the proverbial lead balloon in Seattle. The fear, of course, is that… Read More

CFM LEAP accelerating in test program; Airbus and the A350-800

Aviation Week has a long, detailed story about the test program for the CFM LEAP engine, which is accelerating rapidly. In its 737 MAX program update yesterday, Boeing said the LEAP-1B has begun testing and it will benefit… Read More

737 MAX program update

Boeing today gave an update for the 737 MAX program. Keith Leverkuhn, VP of Program Manager, provided the briefing. Michael Teal, chief project engineer, was also on the call. The highlights, paraphrased: KL:: We’ve had firm systems definition,… Read More

Aerospace Supply Chain challenges for planned production rates

Airbus and Boeing have announced production rates for their single-aisle airplanes of 42/mo each and are thinking of going as high as 52/mo. Boeing last week announced a planned rate of 14/mo for the 787. Airbus has plans… Read More

777X FAL: 50/50 for Washington, decision boils down to tactical or strategic considerations, says trade group chair

The decision where to site the Boeing 777X Final Assembly Line–Everett (WA), where the current 777 is built, or Charleston (SC), where Boeing is rapidly acquiring land and shifting work from Washington–will boil down to tactical or strategic… Read More