Australian magazine profile on KC-30A delays

Update, Feb. 15: at the request of the magazine, we have delinked the article.

Here is a synopsis; the magazine reports:

  • The delay is now 27 months, with deliveries hoped for in March;
  • Writing comprehensive technical manuals for the aircraft and the new boom is taking longer than thought, contributing to but not entirely responsible for the delay;
  • The widely-reported boom separation occurred when “the boom’s probe snapped off near the F-16’s receptacle, causing the boom to spring up and strike the underside of the tanker, snapping off one of the two guiding fins and causing the boom to oscillate wildly until it detached from its supporting mast,” falling into the ocean;
  • As a result, the Spanish authorities (who have jurisdiction over Airbus Military, which is headquartered in Spain) withdrew the flight permits for the RAAF KC-30As “until such time as the aircraft is declared safe to fly again….”;
  • Because of the delays, Airbus “has been liable for liquidated damages on the contract…they are believed to include the cost of using air-to-air refueling tankers from Omega Air and the USAF” for the RAAF’s F/A-18s.

Original Post:

Australian Aviation has a five page profile on the delays to the RAAF KC-30A, including last December’s boom failure.

The PDF may be downloaded here: RAAF KC-30A Delays

Odds and Ends: Leahy staying, not going; tanker and other things

We posted an item Friday that normally would have waited until this edition of Odds and Ends, but the news that John Leahy might leave Airbus next year couldn’t wait. Aviation Week broke the story.

But we spoke with Airbus Toulouse Sunday and the company denied the story.

Read more

First 747-8I rolled out

Boeing rolled out the first 747-8I Sunday (Feb. 13) in pomp and ceremonies that were foregone with the rollout a few years ago of the freighter version.

Here is some of the news coverage:

Seattle Times

Seattle PI

Airlines and Destinations

At a major press event Saturday, attended by some 80 global print and broadcast media, officials touted the 747’s fuel efficiencies compared with previous 747 models and, of course, against the Airbus A380. Airbus and Boeing have been having a running battle for years over which airplane is more efficient; Aubrey Cohen of The Seattle PI discusses this in his article above, which includes a link to a piece we did a year ago citing Lufthansa and Emirates figures which favored Airbus.

Read more

Leahy may leave Airbus next year

This is too good to hold for our Odds-and-Ends Monday. Aviation Week reports John Leahy may leave Airbus next year.

Update, Feb. 13: The link is dead but here is the relevant portion of the article; the cached version is here:

Read more

Slow down on “797” launch

The news agencies are buzzing with stories that Boeing CEO gave the go-ahead for a new replacement for the 737.

This isn’t what we said and what he did say is not new. Do a Google News search to check out all the stories.

McNerney said Boeing prefers a new airplane, and it does; this isn’t new.

He said evaluation continues. This is true; R&D on a re-engine has not, repeat not, been discontinued. This is because no definitive decision has been made.

So slow down, everybody. This isn’t the launch of a new airplane at Boeing.

PNAA: Split buy is only solution for tanker buy

Day 2 of the PNAA conference: Richard Aboulafia, consultant of The Teal Group, said that a split buy is the only way the USAF will be able to procure the KC-X tanker.

Aboulafia said the decision no longer effectively rests with the Air Force, but with Congress. Each political party has the ability to block a sole-source selection, Aboulafia says.

Other thoughts from Aboulafia:

PNAA conference: EADS likely to win tanker contest

We’re at Day 1 of the Pacific Northwest Aerospace Alliance conference in Lynnwood (WA) and at the Defense Focus Day co-organized by the Pacific Northwest Defense Coalition, consultant Michel Merluzeau of G2 Solutions (Kirkland, WA) predicted EADS will likely win the KC-X competition.

Before the Francophiles go crazy, Merluzeau favors Boeing’s KC-767.

Read more

Budget impasse hits tanker funding

We wondered about this months ago and sure enough, there is yet another twist in the KC-X competition: Congressional dithering on the budget means there isn’t (as yet) funding for the tanker procurement that is needed this year. See this story from Defense News.

Odds and Ends: 787 production up to 15/mo

It’s the best-selling airliner in decades before launch, but the it became an embarrassment of riches for Boeing once the delays for the 787 kicked in. Customers face delays of more than three years for delivery and Boeing doesn’t have new sales slots available until the end of the decade.

We asked BCA CEO Jim Albaugh about production capability during our interview with him at the Farnborough Air Show. Theoretically Boeing can produce 17 787s a month: 10 at Everett and seven at Charleston, once the lines are all operating efficiently, Albaugh said, and depending on the supply chain.

During a meeting with employees Feb. 2, Albaugh revised the figure slightly and this kicks off our Odds and Ends column this week.

Read more

Boeing suggests long life for 767

Boeing rolled out the 1,000th 767 Wednesday (Feb. 2) and BCA CEO Jim Albaugh suggested there is a longer life for the airplane even if the USAF doesn’t choose the KC-767 for its next tanker.

Dominic Gates has this story about the event. The Seattle PI quotes Albaugh as predicting 2,000 767s before the line peters out in this story.

We first suggested there might be a longer life in January 2010 with this posting.

We don’t really have much to add to Gates’ story or our previous post except for this refreshed analysis:

Read more