Book Review
July 8, 2019, © Leeham News: When a company authorizes or sponsors a book about some major event, the book is usually a puff piece meant for the coffee table in reception.
Airbus authorized the book, Airbus: The First 50 Years, but it’s no puff piece. It’s an honest, candid accounting of how the company came to be, navigating through country and corporate politics, face offs with rival Boeing, reporting the insider trading allegations and ending with the as-yet unfinished corruption scandal investigations.
Nicola Clark, the aerospace reporter for the International Herald Tribune, did a superb job up to her usual reporting standards while avoiding the puff pieces that usually come with an authorized book.
July 05, 2019, ©. Leeham News: It seems more and more likely the 737 MAX grounding will go well beyond six months and it can approach nine months to a year depending on developments in the next months.
The costs to Boeing for the MAX debacle are now approaching the costs of a new aircraft development.
By Bjorn Fehrm
Subscription Required
July 04, 2019, © Leeham News: Will the Airbus A321XLR change long-haul flying between city pairs within its range? The capacity is around 50% of an A330-900 so an operator could fly twice daily to move the passenger stream if the cost was the same.
Such a frequency advantage requires the seat-mile economics of the XLR to be the same as the A330-900. We use our airliner operating cost model to find out if it is.
Subscription Required
July 1, 2019, © Leeham News: Improving supply chain management is one of the many, many key factors in making the business case for the prospective Boeing New Midmarket Airplane.
The prospective Boeing NMA needs SAP and advanced manufacturing processes to help close the business case. Source: Leeham Co.
The highly complex task of managing a supply chain with millions of parts across many product lines can break down quickly with any weak link, be it from a supplier or in the management system itself.
Quality control, security, misrouting, package integrity in shipping are among the key issues. The sheer magnitude of tracking inventory is huge.
Boeing uses Enterprise Resource Planning and is shifting the system to a new, expanded one called Systems Applications Projects. SAP is the next generation of ERP. Even though ERP has been in use for decades, last year there was a breakdown in deliveries that contributed to production interruptions of the 737 NG (late deliveries of the CFM 56 were a bigger problem).
Boeing’s transition from ERP to SAP is taking longer than anticipated, with a 2021-ish target.
Related articles:
With the NMA business case continuing to be difficult to close, Boeing’s need to attack every cost is clear.
July 1, 2019, © Leeham News: During the Airbus Innovation Days, and in other forums, officials promoted the idea of a 10-abreast coach-class in the A350 XWB.
Compared with the 10-abreast Boeing 777X, officials said the economics of the A350-1000 are unbeatable (along with other claims).
Boeing claims the 777-9 is 25% more economical on a per-seat basis than the A350-1000.
This is an unfair comparison, of course, because the -9 seats about 40 more passengers than the -1000 at nine abreast. Hence, the push for a 10-abreast A350.
All well and good, except a 10-abreast A350 totally busts the XWB brand built up so carefully since it was launched some 10 years ago.
June 28, 2019, ©. Leeham News: “The Federal Aviation Administration has asked The Boeing Company to address, through the software changes to the 737 MAX that the company has been developing for the past eight months, a specific condition of flight, which the planned software changes do not presently address.”
This is the text of an 8-K filing Boeing issued to the stock market two days ago. Here is what it means.
June 26, 2019, © Leeham News: Airlines and lessors are making plans to extend leases by up to one year as the Boeing 737 MAX grounding drags on with no end in sight and carriers scramble to cover their routes, LNA is told.
Shortly after the MAX was grounded, on March 13, airlines began extending leases on airplanes that were to be replaced by the MAX up to six months.
This was until the September-October timeframe.
Now, with estimates that the Federal Aviation Administration may not be ready to lift its grounding order until then—and other regulators may come later—airlines see a need for another lease extension.
Lessors are not interested in another six month extension, however, LNA is told.
By Bjorn Fehrm
Subscription Required
June 27, 2019, © Leeham News: Airbus launched the extended range A321XLR last week at the Paris Air Show.
The range of the aircraft was presented as 4,700nm with an “around 200 seat” cabin. This was 200nm more than the market expected.
We use our performance model to explain what is behind the 4,700nm figure.
By Vincent Valery
June 24, 2019, © Leeham News: The A321XLR launch and IAG’s 737MAX order gathered most of the attention during the 2019 Paris Air Show. Nevertheless, other significant orders were placed by airlines and lessors.