Sept. 9, 2019, © Leeham News: Reports increased last week that Europe’s EASA safety regulator may go its own way in recertifying the Boeing 737 MAX.
The head of IATA, the international trade group, and CEOs of several airlines and one lessor expressed fear and concern EASA won’t act with the Federal Aviation Administration to lift grounding orders of the MAX.
At the Regional Airline Assn. annual conference last week, buzz among journalists focused on one unverified report, based on EASA’s doubts reported during the week yet to hit the media, could significantly extend the grounding—measured in months, not weeks.
I know efforts are being made to verify the information.
If true, the effects would be devastating.
Subscription Required
By Bjorn Fehrm
September 5, 2019, ©. Leeham News: Last week, we examined how a longer-range model of Boeing’s 787-10 would look like. We designed a 787-10ER version (ER for Extended Range) by increasing the Maximum TakeOff Weight of the aircraft. We also did some other adjustments to accommodate the increased weight.
We now compare the resulting aircraft with its nearest competitor, the Airbus A350-900. How would a 787-10ER stack up against an A350-900?
Subscription Required
Introduction
Sept. 4, 2019, © Leeham News: Airbus’ decision a few months ago to keep the A350 production rate at 10/mo appears to be a wise one, considering that there is a small production gap in 2022 but increasingly large ones from 2023.
Boeing boosted rates this year of the 787, which competes with the A350-900 but not the -1000, to 14/mo. Boeing is sold out at this rate in 2020 and 2021, but has a big gap in 2022 and larger gaps thereafter.
Both companies bank on a splurge of orders early next decade to fill the production gaps. Each says there will be a retirement surge beginning in about 2022.
Airbus offers the A330neo and A350. Boeing pitches the 787 and 777X—with a combined production capacity of 35/mo or 389/yr at current rates.
Sept. 2, 2019, © Leeham News: It’s time to catch up on Odds and Ends.
In its second quarter earnings call and 10Q Securities and Exchange Filing, Alaska Airlines said it was returning one Airbus A319 and two A320s off lease this year and next.
These airplanes are from its Virgin America acquisition, which introduced the Airbus family into the all-Boeing Alaska mainline operations.
Alaska officials have said several times they are evaluating whether to phase out all Airbuses and return to an all-Boeing fleet, or keep the Airbuses and operate a mixed fleet indefinitely.
I wondered if this was the start of the phase out.
“We are planning to return 1 A319 this year and 2 A320s next year at normal lease expiration,” Brandon Pederson, EVP and CFO of the company, wrote LNA. “This is not part of a broader fleet decision, nor a phase out of the smaller Airbus aircraft. Leases on the remaining 50 A319/A320 aircraft in the fleet have varying maturities through 2025.”
Subscription Required
By Bjorn Fehrm
August 29, 2019, ©. Leeham News: In last week’s article we went through the reasons for a longer range 787-10, a 787-10ER version (ER for Extended Range). We could conclude it would be an attractive aircraft for the market if it could get another 1,000nm in range.
We use our airliner performane model to analyze how this can be achieved and if Boeing would face large engineering challenges to get to this range.
Subscription Required
Aug. 26, 2019, © Leeham News: Airbus faces near-term challenges with its production skyline for the A330, even at a reduce rate of 4/mo, an analysis shows.
Looking forward from next year, when there are slightly more deliveries scheduled than production rates—a function of some leftover 2019 builds—Airbus faces an easily-filled gap in 2021 but huge production gaps beginning in 2022.
Even if Letters of Intent and options were fully converted to firm orders, big production gaps will exist.
A production rate cut seems inevitable in the near future.
August 23, 2019, ©. Leeham News: In our series about classical flight controls (“fly by steel wire”) and Fly-By-Wire (FBW or “fly by electrical wire”) we now look at practical implementations after discussing the authority of the flight control system last week.
As before we compare the classical 737 system to the A320 FBW system.
Subscription Required
By Vincent Valery
Aug. 22, 2019, © Leeham News: By 2024 the 777-300ER will have been in service for 20 years and the 777-200ER 27 years.
LNA was the first to report the 777-8 entry-into-service will slip by at least two years. Boeing confirmed a delay in the 777-8 development, but not the timeline. Further delays (or an outright cancellation) for the passenger 777-8 are a real possibility. Boeing faces the prospect of not having a latest generation offering in the 330-370 seat market at a time demand for such aircraft is expected to pick up.
As part of the Air New Zealand commitment to purchase eight Boeing 787-10s, Boeing and General Electric are increasing the maximum takeoff weight to add more range.
In a similar fashion to the 777-300ER 20 years ago, Boeing might improve the 787-10 further to turn it into a fully-fledged ER variant. We will analyze the rationale for launching such variant and the challenges Boeing needs to overcome.