Subscription Required
By Vincent Valery
Dec. 17, 2020, © Leeham News: After running a series on the Dreamliner, LNA will now start a series on Airbus’ latest-generation twin-aisle aircraft, the A350. Airbus should deliver its 400th A350 this month.
After a delayed ramp-up to 10 units per month, Airbus had to cut the A350 production rate to five per month after the COVID-19 pandemic. The European OEM might have to follow Boeing’s footsteps and reduce twin-aisle production rates further.
The A350 program has an official backlog of 532 orders: 415 for the -900 and 117 for -1000. Once passenger traffic recovers, Airbus should ramp production back up of its best-selling twin-aisle aircraft.
Despite its success, the A350 program wasn’t without hiccups. There were several and sizable iterations before Airbus finalized the A350 platform, and the -800 variant is non-existent but not officially canceled.
Subscription Required
By Bjorn Ferhm and Vincent Valery
Nov. 26, 2020, © Leeham News: After analyzing the three members of the Dreamliner family on several routes out of San Francisco to Asian destinations, we conclude the series with a wrap- up of what we learned.
Subscription Required
By Bjorn Fehrm
October 29, 2020, © Leeham News: We look deeper at the 787-9, the most successful member of the Dreamliner family. It’s 50 seats larger than the 787-8 but shares the same wing dimensions and engines.
The 787-9 quickly overtook the smaller 787-8 in sales and deliveries once its performance was clear to the airlines.
By following on the 787-8 it could benefit from many enhancements in design and production, becoming a very efficient aircraft in the process. To check its efficiency we run the 787-9 against its predecessor, the Boeing 777-200ER, on the San Francisco to Sydney route and look at the data.
By the Leeham News team
Sept. 29, 2020, © Leeham News: Engine orders for Rolls-Royce on the Boeing 787 tanked in the last five years—pre-COVID.
An analysis reveals that over this period, Boeing booked 952 orders for 787. Of these, 755 selected the GEnx. A mere 80 orders were placed with RR. There were 117 orders for which engines were not selected. This gives GE a 90% share of the selected campaigns.
It gets worse.
Of the 80 aircraft that went to Trent 1000, Boeing removed 44 under ASC 606 accounting rules as too shaky to consider firm orders anymore. These include Avianca, Latam, Norwegian Air Shuttle, etc., which either went into bankruptcy or are restructuring as a result of COVID.
Under this scenario, GE’s share is closer to 95% in last five years.
RR’s Trent 1000 on the 787 is a thorn in the company’s side because of serious technical issues that grounded up to 50 aircraft. Groundings began several years ago. RR continues to deal with the financial fall-out. Some customers switched from RR engines to GEnx in follow-on orders for the 787.
Subscription Required
By Bjorn Fehrm
September 28, 2020, © Leeham News: The worldwide COVID-19 pandemic is shaking the air travel and airliner manufacturing industries like no crisis before.
More than 9/11, the oil crisis of 1973 or 2005 or the financial crisis of 2008. The problems for the airlines and the airframe OEMs are on the front pages of the world’s media.
The part of the airliner industry that is not so visible but is perhaps hardest hit, is the engine industry. Its weird business model amplifies the effects of the crisis.
Summary
Subscription Required
By Bjorn Fehrm
September 10, 2020, © Leeham News: The Airbus A340-600 was designed to challenge Boeing’s hold of the large, long-haul jets. With a capacity 60 seats above the previous largest Airbus jet, the A340-300, and a 7,500nm range, it should put Airbus firmly on the long-haul map.
The A340-600 would be flying its 350 passengers as long and for a lower cost than the 20 seats larger Boeing 747-400, the then-largest long-haul Boeing jet. It would have worked hadn’t Boeing upgraded the 777-300 to the 777-300ER and surpassed the spec. How much better did that make the 777-300ER when it arrived in 2004?
Subscription Required
By Bjorn Fehrm
August 12, 2020, © Leeham News: We deepen our look at the Queen of the Skies and it’s best selling version, the 747-400.
We go through what made it the great aircraft it was and why Qantas replaced it on its trunk routes to the US West coast.
We pick Los Angeles to Sydney as the benchmark route, a route on the range limit for the 747-400, and check how it stacks up economically versus the A380, its replacement.
Subscription Required
By Bjorn Fehrm
July 23, 2020, © Leeham News: Over the last four weeks, we analyzed the venerable Airbus A330, to see if the present low fuel and lease prices make the recent A330neo version less attractive than an older ceo version.
As airlines are cash injection driven in the present COVID-19 crisis, taking delivery of a new aircraft and then do a sell, lease back deal injects fresh cash to the airline. The order deposit and the Pre-Delivery-Payments, PDPs, then flows back to the airline. This is why we see airlines take new aircraft despite not really needing them right now.
The A330 has seen phenomenal growth in capability as the Gross Weight has gone from 212t to 251t over the years. We now wrap the series by looking if there is potential for another stretch in the A330? Could it grow to a true Pacific-Ocean crosser, and if so, what changes should be made?
Subscription Required
By Bjorn Fehrm
July 9, 2020, © Leeham News: Last week, we started the analysis of restoring capacity with the Airbus A330-300 or the A330-900 when reopening international traffic after the COVID-19 lockdown.
As we did with the A330-200 versus the A330-800, we fly them side by side between Paris Charles de Gaulle and Sao Polo’s Guarulhos airports. It’s a 13-hour flight with maximum freight in the cargo bays to gain revenue in addition to our part full cabin.
Will the payload-range of the A330-300 or A330-900 be sufficient to load the aircraft for maximum revenue on the route? We use our airliner performance model to find out.