Sept. 6, 2018, © Leeham News: Boeing officials say the parked inventory of 737s has peaked at around 50 aircraft and should come down slowly as traveled work is performed.
Officials made the comments yesterday at its annual Investors Day for aerospace analysts.
The first two research notes LNC received last night reflected skepticism by Canaccord Genuity and JP Morgan that Boeing will successfully meet its recovery plan by year end.
As more notes were received today, these analysts generally were more receptive to Boeing’s upbeat message.
Sept. 6, 2018, © Leeham News: As incomplete Boeing 737s fill the ramps, taxiways and other available space at Renton Airport and Boeing Field, company officials sought to assure aerospace analysts there is a recovery plan that will see a full complement of deliveries by year-end.
At least two analysts were unconvinced following the annual Boeing Investors Day yesterday.
Boeing 737 MAX awaiting engines, one of dozens of unfinished airplanes at the Boeing Renton plant. Photo via WoodysAeroImages.
In notes issued by Canaccord Genuity and JP Morgan analysts late Wednesday night Seattle time, Kenneth Herbert and Seth Seifman respectively expressed doubt Boeing will meet its 737 delivery target.
danieljcatchpole(at)gmail(dot)com
September 3, 2018, © Leeham News: Boeing’s insistence that more and more subcontractors meet stringent aerospace manufacturing standards risks adding cost and reducing flexibility to the supply chain, several direct and indirect Boeing suppliers tell LNC.
The aerospace giant is requiring more second and third tier suppliers have AS9100 certification. Until recent years, OEMs and their direct suppliers typically were the only companies that formally complied with AS9100.
Subcontractors were expected to conform to the standards, but did not have to formally comply with the requirements. Doing so is expensive and time consuming. Subcontractors’ work was covered by the Tier 1 suppliers’ or Boeing’s AS9100 certification.
The AS9100 standards were adopted in the late 1990s to improve and standardize quality management throughout the increasingly global aerospace industry.
August 31, 2018, ©. Leeham News: In the last Corner we discussed supersonic lift wave drag and how suddenly the length aspect ratio is more important than wingspan aspect ratio.
Now we talk about the problem of going from subsonic to supersonic flight.
Subscription Required
Aug. 30, 2018, © Leeham News: As time goes by, the Middle of the Market airplane appears to have become the Muddle of the Market.
Boeing can’t seem to close the business case on its Middle of the Market airplane, the New Midmarket Aircraft, or NMA.
And Airbus continues to stir the pot with talk of an A321XLR and the ever-present A321neo Plus.
Other than this, everything is fine.
Subscription Required
Part 1 appears here.
By Dan Catchpole
August 27, 2018, © Leeham News: For all its potential, additive manufacturing faces significant hurdles before it can deliver on advocates’ assertions that the technology will revolutionize the aerospace industry.
United Technologies is counting on additive manufacturing, often called 3D printing, to help it develop and produce new components faster, better and cheaper. Paula Hay is leading the expansion of additive manufacturing at United Technologies Aerospace Systems (UTAS). In part two to last week’s interview with Hay, LNC talks to her about what problems have to be solved for additive manufacturing (AM) to make good on its potential.
Summary
August 24, 2018, ©. Leeham News: In the last Corner we discussed how supersonic wave drag can be higher than any other drag for a blunt fuselage trying to fly at supersonic speeds. If we try to fly supersonically with a Dreamliner fuselage, the volume wave drag is four times as large as the whole Dreamliner drag when flying at its normal cruise speed.
Besides wave drag based on bodies volumes we also have wave drag when we angle lift surfaces like wings against air to create lift.