Subscription Required
Aug. 7, 2017, © Leeham Co.: Amid talk that Middle Eastern airlines, which are the largest group of users for wide-body aircraft, may defer Airbus and Boeing airplanes, there are conflicting signs that the bleak view of the sector isn’t as weak as perceived.
Just last week, two big lessors—Air Lease Corp and AerCap–of widebody airplanes said they are confident in the sector.
Few orders have been received for the Boeing 777-8 ultra-long range airplane. Sales for its larger sibling, the 777-9, have stalled. Along with the Airbus A380 and Boeing 747-8, demand is seen as limited.
AerCap ordered 30 Boeing 787s at the Paris Air Show. ALC has a significant order of Airbus A330neos.
And, the chairman of Emirates Airline said in an interview with the region’s The National newspaper that despite the current challenges at the carrier, it expects to announce an order before the end of the year for either the 787 or the Airbus A350—and possibly the Airbus A380.
Quantities on the former weren’t discussed. Airbus is pitching 20 A380s, according to accounts.
Still, there are a large number of Boeing 777s and Airbus A330s coming off lease in the next few years that could slow orders if these aircraft are offered on the secondary market with low enough lease rates.
Aug. 7, 2017, © Leeham Co.: The quote appeared on Twitter, citing the chairman of Air Lease Corp, Steven Udvar-Hazy:
“I would simply but strongly encourage the OEMs to carefully review their production rate aspirations closely and realistically.”
Hazy, often (but erroneously) called the “Godfather of leasing,” is a voice to be reckoned with. He is enormously influential with Airbus, Boeing, lessors and the industry. He’s been a launch customer of several aircraft new aircraft models and, if he’s not the Godfather of leasing (this title really belongs to the late George Batchelor), Hazy raised aircraft leasing to a fine art.
So, when the quote appeared on Twitter, I sat up in my chair.
Was Hazy suggesting Airbus and Boeing will be producing too many airplanes, creating a supply-demand imbalance?
August 03, 2017, ©. Leeham Co: In our search for an electric regional aircraft configuration, we found that a jet aircraft requires too high power levels. The higher speeds of a jet aircraft take the power levels beyond what we can handle with an electric hybrid propulsion system.
Our ambition is to transport 50 passengers on a regional network. For networks which have sectors around 200-300nm, the turboprop is the preferred regional aircraft. We will now re-direct our hybrid regional aircraft project to this market segment.
By Bjorn Fehrm
Subscription Required
August 03, 2017, © Leeham Co.: The Airbus A321 has been in its own single aisle league for capacity and with the A321LR for capacity and range.
With Boeing’s launch of the 737 MAX 10, the unique position has taken a hit. With A321 occupying 40% of Airbus single aisle sales, Airbus is examining how to re-open the gap.There is much talk about an A322: an aircraft with new wing, engines and so forth. This is a major undertaking and will need new engines for its realization. Couldn’t Airbus improve the A321 as it is?
We look into what short term improvements can be done to the A321, and what these would give.
By Bjorn Fehrm
August 2, 2017, ©. Leeham Co: “Etihad, where to now?” was our headline on our May review of the Gulf airline. The 2016 revenue and earnings were not clear at the time.
Etihad group has now released the results, with a group loss of $1.9bn on revenues of $8.4bn. This is a shortfall of almost a quarter of the turnover, a dramatic change from a profit of $259m the year before.. Read more
July 28, 2017, © Leeham Co.: Embraer reported first half net income of $101.6m after a $59.1m net profit for the second quarter.
Revenues for the half were $2.8bn and $1.77bn for the quarter.
EMB delivered 35 EJets during the quarter and 53 for the half.
Free cash flow for the quarter was $220m but just $20.7m for the half.
The company had $3.55bn in cash and securities at the end of the half.
The backlog of all civil, corporate and military programs declined from $19.2bn at March 31 to $18.5bn at June 30. A year ago, the backlog was $21.9bn.
The press release is here.
By Bjorn Fehrm
July 28, 2017, ©. Leeham Co: Bombardier presented its 2Q2017 results this morning. Performance followed guidance, with stronger than expected margins in business aircraft and trains. Overall the business tracks the turnaround plan, presented end 2015.
Because of constrained delivery of Pratt & Whitney GTF engines for 1H 2017, only seven CSeries got delivered. A full year delivery of around 30 CSeries is still the target.
July 28, 2017, ©. Leeham Co: In the last Corner, we looked at the mass of the propulsion components for a regional airliner.
Now we complete the mass estimations for the complete hybrid electric system.
We do that for our aircraft project, which is a regional jet airliner with 50 seats. It’s using a hybrid propulsion system with four electric propulsors fed by a Gas turbine driven generator. The system uses a battery as a redundant energy source.