Subscription Required
By Scott Hamilton
Introduction
Oct. 4, 2021, © Leeham News: Engine and airframe makers are well on their way to becoming fully capable of using Sustainable Aviation Fuel (SAF). But the industries providing SAF are way behind in meeting the potential demand.
Rick Deurloo. Sr. VP & Chief Commercial Officer at Pratt & Whitney said one major US airline would use all currently available SAF in one day.
“The challenge will be the feedstock. How do we grow that technology or grow that ability to provide the feedstock so when we do have 100% SAF-capable aircraft and engines, we have the energy to go with it?” Deurloo said in an interview with LNA at the IATA AGM this week in Boston.
Airlines around the world are partnering with different companies to develop this technology, he said.
PW is already 50% capable and has a “clear path” to getting 100% capable within two years. But there is not enough feedstock in the world today do fill the 50% capability.
October 1, 2021, ©. Leeham News: Last week, we described how we produced our Flight Test Articles, FTAs, and how the company flight tests are made.
Now we have finished the Company flight tests and made any modifications required to the FTAs so we can apply for Certification Flight tests with the regulator.
Subscription Required
By Bjorn Fehrm
September 30, 2021, © Leeham News: In last week’s article, we put the question: Has the increased cargo pricing started to affect the choice of airliner variant?
We analyzed Boeing’s 787-8 and -9 for margin generation when flying at low post-pandemic load factors. We found the 787-9 is the more attractive alternative as long as air cargo pricing stays high, even though the passenger load factor on the route would motivate a 787-8. The revenue from under the floor cargo compensates for a low load factor in the cabin. Now we subject the Airbus range; A330neo, and A350 to the same analysis.
By Scott Hamilton
Sept. 28, 2021, © Leeham News: Airbus is streamlining some of its production of the A220 to reduce costs and the time to assemble the airplanes at its Montreal and Mobile plants.
Florent Massou, the SVP and Head of the A220 program, told LNA the company wants to shave 50% of the final assembly time for the A220. There will be an unrevealed cost reduction, which Massou declined to reveal. But he said it isn’t a one-for-one cost reduction.
Final assembly typically runs 5% to 8% of the total cost of the airplane, according to Boeing’s touch labor union, the IAM 751. Whether this equates to the A220, which began life as a Bombardier aircraft, is unknown.
Subscription Required
By the Leeham News Team
Sept. 27, 2021, © Leeham News: The race for the Boeing 777 P2F Freighter conversion is on.

IAI Bedek Big Twin Boeing 777-300ERF passenger-to-freighter conversion. Lessor GECAS, now part of AerCap, was the launch customer of this, the first 777 P2F program. Source: IAI Bedek.
There are three companies in various stages of development. The first, IAI Bedek, announced its conversion process in 2019 with an order from the giant lessor, GECAS (now a part of AerCap). The second is a program driven by Nair Werx of Wichita (KS) and marketed by Sequoia Aircraft Conversions. The third is the recently announced Mammoth Freighter Conversions of California and Florida.
IAI has cut metal. Mammoth is test-flying a 777-200LR for stress and technical analysis. NAIR is in the pre-production Engineering Phase.
Let’s take a moment to understand the process of a P2F Conversion.
September 24, 2021, ©. Leeham News: Last week, we looked at the necessary Production Certificate for the production of our airplanes.
Now our program plan has approached the mid-phase of the Post-Launch phase. We start assembling our test aircraft to get to flight tests.
Subscription Required
By Bjorn Fehrm
September 23, 2021, © Leeham News: In last week’s article, we put the question: Has the increased cargo pricing started to affect the choice of airliner variant?
We listed recent decisions between the Boeing 787-8 and -9 or Airbus A330-900 and A350-900 where the traffic levels post-pandemic would motivate the smaller variant, but the larger was retained or selected.
It makes you wonder whether the higher cargo capacity of the larger variant compensates for flying a larger cabin at a lower load factor? We make a cost and revenue analysis to find out.
By Bjorn Fehrm
September 21, 2021, ©. Leeham News: Airbus helicopter division presented their entry for the UAM market today at the Airbus 2021 Summit in Toulouse.
It was a presentation of a vehicle and ecosystem that has been cooking for years. After two demonstrators that tested different aspects of eVTOL flight and thousand of hours on supercomputers and in wind tunnels, the final CityAirbus is here, Figure 1.
Its configuration is as unique as Airbus’ approach when presenting it.