Aug. 8, 2017, © Leeham Co.: Delta Air Lines asked the US Department of Commerce to redefine the scope of the Boeing complaint of Bombardier price dumping in its CS100 order with the carrier, filings at DOC show.
Delta asked the DOC to redefine the aircraft definition from 100-150 seat to 125-150 seats, arguing that Boeing doesn’t make in airplane in the 100-125 seat size and therefore isn’t harmed by competition in the sale of the 110-seat CS100 that Delta ordered.
Posted on August 8, 2017 by Scott Hamilton
Subscription Required
Aug. 7, 2017, © Leeham Co.: Amid talk that Middle Eastern airlines, which are the largest group of users for wide-body aircraft, may defer Airbus and Boeing airplanes, there are conflicting signs that the bleak view of the sector isn’t as weak as perceived.
Just last week, two big lessors—Air Lease Corp and AerCap–of widebody airplanes said they are confident in the sector.
Few orders have been received for the Boeing 777-8 ultra-long range airplane. Sales for its larger sibling, the 777-9, have stalled. Along with the Airbus A380 and Boeing 747-8, demand is seen as limited.
AerCap ordered 30 Boeing 787s at the Paris Air Show. ALC has a significant order of Airbus A330neos.
And, the chairman of Emirates Airline said in an interview with the region’s The National newspaper that despite the current challenges at the carrier, it expects to announce an order before the end of the year for either the 787 or the Airbus A350—and possibly the Airbus A380.
Quantities on the former weren’t discussed. Airbus is pitching 20 A380s, according to accounts.
Still, there are a large number of Boeing 777s and Airbus A330s coming off lease in the next few years that could slow orders if these aircraft are offered on the secondary market with low enough lease rates.
Posted on August 7, 2017 by Scott Hamilton
Aug. 7, 2017, © Leeham Co.: The quote appeared on Twitter, citing the chairman of Air Lease Corp, Steven Udvar-Hazy:
“I would simply but strongly encourage the OEMs to carefully review their production rate aspirations closely and realistically.”
Hazy, often (but erroneously) called the “Godfather of leasing,” is a voice to be reckoned with. He is enormously influential with Airbus, Boeing, lessors and the industry. He’s been a launch customer of several aircraft new aircraft models and, if he’s not the Godfather of leasing (this title really belongs to the late George Batchelor), Hazy raised aircraft leasing to a fine art.
So, when the quote appeared on Twitter, I sat up in my chair.
Was Hazy suggesting Airbus and Boeing will be producing too many airplanes, creating a supply-demand imbalance?
Posted on August 7, 2017 by Scott Hamilton
August 03, 2017, ©. Leeham Co: In our search for an electric regional aircraft configuration, we found that a jet aircraft requires too high power levels. The higher speeds of a jet aircraft take the power levels beyond what we can handle with an electric hybrid propulsion system.
Our ambition is to transport 50 passengers on a regional network. For networks which have sectors around 200-300nm, the turboprop is the preferred regional aircraft. We will now re-direct our hybrid regional aircraft project to this market segment.
Posted on August 4, 2017 by Bjorn Fehrm
By Bjorn Fehrm
Subscription Required
August 03, 2017, © Leeham Co.: The Airbus A321 has been in its own single aisle league for capacity and with the A321LR for capacity and range.
With Boeing’s launch of the 737 MAX 10, the unique position has taken a hit. With A321 occupying 40% of Airbus single aisle sales, Airbus is examining how to re-open the gap.There is much talk about an A322: an aircraft with new wing, engines and so forth. This is a major undertaking and will need new engines for its realization. Couldn’t Airbus improve the A321 as it is?
We look into what short term improvements can be done to the A321, and what these would give.
Posted on August 3, 2017 by Bjorn Fehrm
By Bjorn Fehrm
August 2, 2017, ©. Leeham Co: “Etihad, where to now?” was our headline on our May review of the Gulf airline. The 2016 revenue and earnings were not clear at the time.
Etihad group has now released the results, with a group loss of $1.9bn on revenues of $8.4bn. This is a shortfall of almost a quarter of the turnover, a dramatic change from a profit of $259m the year before.. Read more
Posted on August 2, 2017 by Bjorn Fehrm
July 31, 2017, © Leeham Co.: It’s been in a quiet period in the trade complaint between Boeing and Bombardier.
The issue moved over to the US Department of Commerce (DOC) after the US International Trade Commission (ITC) concluded there were grounds to continue the probe. Then Boeing moved for a two-month delay, to September. There it sits. But as July moves into August and with the September decision date around the corner, it’s time to revisit the issue.
Posted on July 31, 2017 by Scott Hamilton
Subscription Required
July 31, 2017, © Leeham Co.: It’s time for our mid-year update of the Big Four airframe manufacturers and their production/delivery outlooks.
Our update is through June 30. Although Boeing provides weekly order updates, Airbus, Bombardier and Embraer only do so monthly.
Our update data relies on the Airfinance Journal Fleet Tracker.
Today we look at Bombardier and Embraer.
Posted on July 31, 2017 by Scott Hamilton
July 28, 2017, © Leeham Co.: Embraer reported first half net income of $101.6m after a $59.1m net profit for the second quarter.
Revenues for the half were $2.8bn and $1.77bn for the quarter.
EMB delivered 35 EJets during the quarter and 53 for the half.
Free cash flow for the quarter was $220m but just $20.7m for the half.
The company had $3.55bn in cash and securities at the end of the half.
The backlog of all civil, corporate and military programs declined from $19.2bn at March 31 to $18.5bn at June 30. A year ago, the backlog was $21.9bn.
The press release is here.
Posted on July 28, 2017 by Scott Hamilton
By Bjorn Fehrm
July 28, 2017, ©. Leeham Co: Bombardier presented its 2Q2017 results this morning. Performance followed guidance, with stronger than expected margins in business aircraft and trains. Overall the business tracks the turnaround plan, presented end 2015.
Because of constrained delivery of Pratt & Whitney GTF engines for 1H 2017, only seven CSeries got delivered. A full year delivery of around 30 CSeries is still the target.
Posted on July 28, 2017 by Bjorn Fehrm