By Bjorn Fehrm
Subscription Required
March 26, 2018, © Leeham News: Boeing’s NMA or 797 is taking final form ahead of a decision to essentially launch the program with an Authority to Offer (ATO), widely believed to be later this year.
In the first article, we looked at the key characteristics of the design. We also looked at the engine situation in a couple of articles.
Now we round up the series with analyzing the potential economics of the aircraft.
Figure 1. The first sketch of the smaller 797-6X with 224 seats. Source: JonOstrower.com
Summary:
Subscription Required
March 22, 2018, © Leeham Co.: As Boeing enters the final stretch whether to launch the New Midrange Aircraft (NMA, aka 797) market focus should shift to the engines more than the airframe and even the market demand.
It all comes down to this: no engines, no plane.
Monday’s post outlined some of the issues to consider.
But there are larger implications as well.
March 22, 2018, © Leeham News: GE Aviation/CFM International are in “lockstep” with Boeing for development of an engine for the New Midrange Aircraft (NMA, or 797), the CEO of GE Aviation told a JP Morgan Aviation conference last week.
David Joyce acknowledged that there are technical issues and production delays for the new CFM LEAP 1A and 1B that power the Airbus A320neo and Boeing 737 MAX families respectively. Production is running up to six weeks late, but should be caught up by the end of this year, he said.
Technical issues, while affecting at least 100 engines, nevertheless are far less of an issue than those plaguing rival Pratt & Whitney’s Geared Turbo Fan.
By Bjorn Fehrm
Subscription Required
March 15, 2018, © Leeham News: Boeing’s NMA or 797 is taking final form ahead of a decision to launch the program later in the year.
Jon Ostrower has published the first picture of the projected aircraft, which he acknowledges might change in its final form. Figure 1 shows the smaller of the two NMA models, the 224-seat 797-6X.
Figure 1. The first sketch of the smaller 797-6X with 224 seats. Source: JonOstrower.com
We take a closer look at the 797 in its latest definition.
Summary:
By Bjorn Fehrm
March 14, 2018, ©. Leeham Co: India’s Directorate General of Civil Aviation (DGCA) grounded Airbus A320neos equipped with Pratt & Whitney GTF engines with faulty compressor seals Monday.
Affected are eight A320neos of Indigo airlines and three A320neos of GoAir. The Indian groundings are unusual as they go beyond the directives of EASA and FAA for the problem.
March 14, 2018, © Leeham Co.: Airbus and Boeing have engine issues on in-service airplanes, but customers point to very different responses to getting their grounded airplanes back in the air.
Airbus’ problems with A320neos powered by Pratt & Whitney Geared Turbo Fan engines have been making headlines almost since introduction in late 2016.
Less well publicized, but nevertheless by now well-known within the industry, has been Boeing’s 787 powered by Rolls-Royce Trent 1000 engines.
March 5, 2018, © Leeham Co.: The three engine makers, CFM/GE, Pratt & Whitney and Rolls-Royce, are the only suppliers that have been brought “inside the tent” by Boeing for the New Midrange Aircraft, a company executive said today.
Launching the program is critical on the engine companies, says Randy Tinseth, VP marketing for Boeing. Boeing hasn’t decided—officially—whether it will have a
Randy Tinseth. Photo via Google images.
single-engine or dual-engine source for the aircraft because the program hasn’t been launched.
Market intelligence tells LNC that Boeing wants two engine choices. Intel also indicates all three engine OEMs view the market demand as sharply smaller than Boeing’s publicly-stated forecast of 4,000 Middle of the Market sector airplanes over the next 20 years.
Feb. 16, 2018, © Leeham Co.: It’s been a long struggle and there isn’t a re-engining any time soon, but John Leahy still firmly believes in the market viability of the Airbus A380.
John Leahy stand behind the Airbus A380. Photo via Google images.
Leahy, who retired last month as COO-Customers, continues to support the transition to Eric Schulz, EVP, Chief of Sales, Marketing & Contracts. One of Leahy’s last deals was to firm up an A380 MOU for 20 orders and 16 options for Emirates Airline.
In his final retirement interview with LNC, Leahy didn’t waver from the messaging Airbus used since the launch of the A380 program in 2000: passenger traffic doubles every 15 years, no new airports and few new runways are being added in Europe, the US or Asia outside of China and the need for the A380 remains.