By Bjorn Fehrm
Subscription Required
August 16, 2017, © Leeham Co.: At the end of 2014, we predicted the Boeing 737 MAX 8 would be used by LCCs to open new long-range destinations. And sure enough, the fourth MAX 8 off the line went to Norwegian Air Shuttle, for trans-Atlantic operations.
The Bombardier CSeries launch of operations from London City Airport last week gave us the chance to discuss CSeries long-range characteristics with Rob Dewar, VP CSeries program at Bombardier.
With the improved performance data to be announced, the CS300 will pass the range of the MAX 8.To understand with what margin and costs we feed our performance model with the latest information.
Posted on August 17, 2017 by Bjorn Fehrm
Aug. 15, 2017, © Leeham Co.: Small airlines face continuous challenges about acquiring modern aircraft at prices they can afford.
There was once a number of manufacturers producing small airliners. British Aerospace (BAe) produced the 19-seat Jetstream and Beech the 19-seat 1900. Saab built the 340 and later the 2000. BAe tried to update the old Hawker Siddeley 748 with the ATP, Advanced Turbo Prop. Fokker upgraded the F-27 to the F-50. Embraer got its start with the small Bandierante and really hit the mark with the Brasilia.
Bombardier produced the Dash-8 40-seat turboprop in competition with ATR’s ATR-42 and both compete with a 70-90 seat turboprop. BBD dropped its Dash 8 and barely holds on with the Q400. ATR is the dominant player now. (China produces a turboprop, but it’s mostly a captive-market airplane.)
BAE, Saab and Beech exited the commuter airplane business. Fokker went out of business. Embraer moved to jets.
This leaves smaller, independent regional and commuter airlines in a real bind. There are simply no replacements for the 19- to 30-seat airliner, save one: the Viking Twin Otter. More about this below.
Posted on August 15, 2017 by Scott Hamilton
By Bjorn Fehrm
Subscription Required
Introduction
August 10, 2017, © Leeham Co.: Last week we started the look into how the Airbus A321neo could be incrementally improved. To understand what can improve an aircraft, ones need to understand its limitations.
The A321neo is mainly limited by its wing, which is highly loaded. But there are ways around this limitation other than developing a new wing, an exercise which would require time, money and a new certification program.
Having understood the limitations, we now look into what can be done about them.
Summary:
Posted on August 10, 2017 by Bjorn Fehrm
By Bjorn Fehrm
August 09, 2017, © Leeham Co.: Bombardier (BBD) CSeries has done its first revenue flight to London City Airport. It was a scheduled Swiss International Airlines (SWISS) flight from Zurich that landed on the airport yesterday.
With the CSeries operational from London City, the route network that can be flown from the downtown airport changes significantly. Europe out to Moscow or Las Palmas is accessible and an all business class CS100 could fly direct to New York.
Posted on August 9, 2017 by Bjorn Fehrm
Aug. 7, 2017, © Leeham Co.: The quote appeared on Twitter, citing the chairman of Air Lease Corp, Steven Udvar-Hazy:
“I would simply but strongly encourage the OEMs to carefully review their production rate aspirations closely and realistically.”
Hazy, often (but erroneously) called the “Godfather of leasing,” is a voice to be reckoned with. He is enormously influential with Airbus, Boeing, lessors and the industry. He’s been a launch customer of several aircraft new aircraft models and, if he’s not the Godfather of leasing (this title really belongs to the late George Batchelor), Hazy raised aircraft leasing to a fine art.
So, when the quote appeared on Twitter, I sat up in my chair.
Was Hazy suggesting Airbus and Boeing will be producing too many airplanes, creating a supply-demand imbalance?
Posted on August 7, 2017 by Scott Hamilton
August 03, 2017, ©. Leeham Co: In our search for an electric regional aircraft configuration, we found that a jet aircraft requires too high power levels. The higher speeds of a jet aircraft take the power levels beyond what we can handle with an electric hybrid propulsion system.
Our ambition is to transport 50 passengers on a regional network. For networks which have sectors around 200-300nm, the turboprop is the preferred regional aircraft. We will now re-direct our hybrid regional aircraft project to this market segment.
Posted on August 4, 2017 by Bjorn Fehrm
By Bjorn Fehrm
Subscription Required
August 03, 2017, © Leeham Co.: The Airbus A321 has been in its own single aisle league for capacity and with the A321LR for capacity and range.
With Boeing’s launch of the 737 MAX 10, the unique position has taken a hit. With A321 occupying 40% of Airbus single aisle sales, Airbus is examining how to re-open the gap.There is much talk about an A322: an aircraft with new wing, engines and so forth. This is a major undertaking and will need new engines for its realization. Couldn’t Airbus improve the A321 as it is?
We look into what short term improvements can be done to the A321, and what these would give.
Posted on August 3, 2017 by Bjorn Fehrm
Subscription Required
July 31, 2017, © Leeham Co.: It’s time for our mid-year update of the Big Four airframe manufacturers and their production/delivery outlooks.
Our update is through June 30. Although Boeing provides weekly order updates, Airbus, Bombardier and Embraer only do so monthly.
Our update data relies on the Airfinance Journal Fleet Tracker.
Today we look at Bombardier and Embraer.
Posted on July 31, 2017 by Scott Hamilton
By Bjorn Fehrm
July 27, 2017, ©. Leeham Co: Airbus Group presented its 2Q2017 results this morning. The result for the first half and the full year of 2017 is decided by A320neo engine deliveries.
Out of a planned 200 A320neo deliveries for the year, Airbus could deliver 54 aircraft during the first half, with 35 completed aircraft waiting for engines on the Airbus tarmac.
Posted on July 27, 2017 by Bjorn Fehrm
Boeing’s tactical option for MOM sector
Subscription RequiredIntroduction
Aug. 14, 2017, © Leeham Co.: It’s not a done deal yet—the business for the so-called Boeing 797 remains a challenge. But the consensus is that Boeing will launch the program next year, for an entry-into-service around 2025.
Boeing 797 concept. Source: Boeing.
Yet there are airlines that say they don’t want to wait that long for a new airplane.
What are their choices?
Read more
7 Comments
Posted on August 14, 2017 by Scott Hamilton
air force tanker, Airbus, Airlines, American Airlines, Boeing, Bombardier, CFM, Delta Air Lines, GE Aviation, Leasing, Leeham News and Comment, Middle of the Market, MOM, Pratt & Whitney, United Airlines, US Airways
737-10, 737-9, 757, 767-200ER, 767-300ER, 777, 777-300ER, 797, A330-200, A330-800, Airbus, airlines, American Airlines, Boeing, Delta Air Lines, Japan Air Lines, Middle of the Market, MOM, New Midrange Aircraft, NMA, United Airlines